Victoria Dock

Our first overnight on Jenna in 2006, with Cloth Porridge, in very reasonable weather for the time of year.
 
Date Sunday 16th April 2006 – Monday 17th April
Time 0930
Tide UTC 16 1202 7.44 0617 1.34 1839 1.34
17 0020 7.13 1238 7.22 0653 1.49 1917 1.63
Crew list Carolyn and Glen
Distance 25.4 miles

Route

Time Location
Outward: Saturday 16th April
1030 Set off
1155 Swellies
1204 Brit. Bridge
1347 Victoria Dock
Return: Sunday 17th April
1030 Victoria Dock
1140 Brit. Bridge
1150 Menai Bridge
1230 Mooring

Route


 

Notes

Derek had lent us his Stilson to tighten our stern gland / prop shaft, so this was my first task. This proved a very simple job with a couple of small turns to cure the leak.

There wasn’t enough wind to sail at first, so we motor sailed up to Menai Bridge. We went through the Swellies late so were able to take the tide with us.

 

Derek and Carol Jones on Cloth Porridge

After this we did a bit of tacking and found the new foresail to be much better than the old one. The wind was very flukey and went from nothing to flattening us in short measure. We made good progress. Derek wanted to stop off at Port Dinas to drop Carol off, so we loitored around while he did this.

Halfway to Victoria Dock we were overtaken by She Fever with Derek and Carol Asquith on board.

She Fever

Later that evening we went into the Royal Welsh Yacht Club and had a few drinks.

The journey back was uneventful!

Lessons Learned